Blog

October 08, 2018

Kings Row Milton

The final combined stages (3 and 4) of Kings Row Milton is now complete and in the process of acquiring tenants for the new office towers. Recently completed stage one and two office buildings feature typical floor plates of 1,039m2 with direct access to Coronation Drive from the ground floor. The location on Coronation Drive offers a bus stop adjacent to the front door of the building.

The second building offers five levels of accommodation above the ground floor, with a childcare centre on the ground floor of the building. The building features outstanding signage opportunities and is a brief walk to Park Road retail and both the CityCat terminals and Milton Train Station.

There are 400 secure car spaces servicing the development in addition to the visitor parking available.

Stage 3 & 4 were built together and offer both individual floors of 1,039m2 as well as two individual floors spanning both buildings offering a super plate of 2,153m2 suited for a major corporate.

The buildings have excellent natural light and river and city views from most floors. Part of the buildings incorporate “End of Trip” facilities to encourage bicycle travel. It features 66 bike racks and lockers, showers and toilets for males and females. This facility also includes a towel service on site and is fully air-conditioned.

Located on Coronation Drive, just 1.5 kilometres to the Brisbane CBD, it is an outstanding location, serviced by multiple, nearby public transport options. The final project also offers the use of a swimming pool, tennis courts and BBQ facilities at the adjoining heritage listed Milton House. 

Opening in the next few months, some of the floors are fitted out with over 50 individual offices and a range of operational layouts.